Hidden Design Mini Relay Car Tracking Device MiCODUS MV930 Anti-theft Realtime Location Motorcycle GPS Tracker With Kill Switch

Hidden Design Mini Relay Car Tracking Device MiCODUS MV930 Anti-theft Realtime Location Motorcycle GPS Tracker With Kill Switch

One Year Free APP
$19.90
Skip to product information
Hidden Design Mini Relay Car Tracking Device MiCODUS MV930 Anti-theft Realtime Location Motorcycle GPS Tracker With Kill Switch

Hidden Design Mini Relay Car Tracking Device MiCODUS MV930 Anti-theft Realtime Location Motorcycle GPS Tracker With Kill Switch

$19.90
2G MV930
Note: This is 2G GPS tracker, not applicable to US, Korea, Japan, China Taiwan, Canada, Australia, New Zealand, Singapore and other countries that have stopped 2G network, please contact us for 4G version.

SIM card no data, need to be topped-up.

Mian Features:
1. Hidden Design and Easy Installation
2. Wide Operating Voltage 9-90V DC, compatible with vehicles on the market!
3. Remotely Cut Off & Resume Fuel
4. GPS+LBS+GLONASS Three Positioning Ways
5. Realtime Tracking
6. History Route Playback
7. Power Saving Mode
8. Overspeed Alarm
9. Shake Alarm
10. Movement Alarm
11. Virtual Fence
12. Sleep Mode:
13. Illegal Cutting Line Alarm
14.ACC Status Detection
15.Tow Alarm
16.Auto Arm
17. One Year FREE WEB TRACKING SOFTWARE AND MOBILE APP!
18.The Tracking Platform Supports Multiple Languages.

www.micodus.net
APP: MiCODUS
Wide working voltage 9-95V DC
MV930 can be applied to various vehicles: car, truck,electric bike, motorcycle, bus, scooter etc.Google Mapsreal-time positioning
the minimum data upload time interval of MV930 is 5 secondsHistorical route playback
our MiCODUS server can store data for up to 180 daysVehicle BatteryVoltage Detecting
MV930 can detect vehicle battery's voltage, and can send alert message when the battery is lower than the threshold valueRemotely Cut Off Fuel
It can remotely cut off and restore the fuel circuit, which is suitable for vehicle theft or loss of control of the vehicleAuto Arm By ACC
Intelligent automatic arming and disarming according to ACC status, no manual operation requiredGPS Data Compens By Cornering
When turning, the device will upload a GPS data in order to reflect the details of turning, the uploaded positioning data will be more denser and the trajectory query is more accurateGPS Data Supplementary Of Network Blind Area
Without network, the device will disconnect with the server, but the GPS data will be saved by the built-in memory, once the network signal recovered the saved data will be uploaded to the tracking server.Multipleanti-theft alarm functions
Web Tracking Platform and Mobile APP
One Year free Micodus tracking system! Web server and both iOS and Android version APP are available!
www.micodus.net
APP: MiCODUS

You may also like